The new season of digital connections – 2025 was opened
+7 (499) 266-69-96
Address
1–33, plot 1, Letchika Babushkina str., Moscow, Russia, 129344
04.03.2025

The new season of digital connections – 2025 was opened

The Izvestkovaya station of Far-East Railway of Russian Railways was equipped with computer-based interlocking system MPC-EL designed and produced by ELTEZA company.

68 switches and 89 color lights was connected to MPC-EL on the station.

The system was installed in complexity with other ELTEZA’s equipment, such as UEP-U generic power supply device with backup power failure and SP-6MG-N electric switch machines.

Moreover, in February, as part of the technical re-equipment and import substitution program, the Russian MPC-EL system was put into operation at the Kosobrodsk station of the South-Ural Railway (25 switches, 36 traffic lights).

The new equipment allows for remote control of switches and traffic lights, while ensuring the protection of the infrastructure from unauthorized access and cyber attacks due to the integrated KSPK-EL cyber defense system.

 

Back